| Conservacion delCamino Atoyac San Miguel Totolapan Lo-E87 | 12.6M | 2016-03-01 |
| Conservacion delCamino: E.C. (Chilpancingo Tlapa) Olinala Io-N7 | 8.6M | 2014-03-10 |
| Modernizacion delCamino Tlapa Alcozauca Io-N70 | 8.3M | 2013-04-29 |
| Modernizacion delCamino Cruz Grande Pico delMonte N2 | 8.2M | 2012-02-20 |
| Reconstruccion Estabilizacion de Terraplen Lo-E176-2019 | 7.9M | 2019-12-16 |
| Conservacion delCamino San Jeronimo Io-E352 | 7.8M | 2017-02-06 |
| Conservacion de Los Caminos Copanatoyac Zapotitlan Tablas So-N208 | 6.9M | 2013-10-16 |
| Reconstruccion de Muro de Contencion Zampeado a Base de Mamposteria Lo-E146-2020 | 5.0M | 2020-09-01 |